Mid-Year Update of the Risk-Based Audit Plan 2013-2014 to 2015-2016
Date: September 2013
PDF Version (485 Kb, 41 Pages)
Table of Contents
- Introduction
- The Role and Scope of Internal Audit
- Risk-Based Audit Planning Approach
- The Three Year Risk-Based Audit Plan
- Resource Considerations
- Appendix A - AANDC Audit Universe
- Appendix B - Linkage of 2013-2014 Audits to the Corporate Risk Categories
- Appendix C - Linkage of 2013-2014 Audits to MAF Elements
- Appendix D - 2013-2014 Audit Projects
- Appendix E - Changes to the Audit Plan
Introduction
The Treasury Board Policy on Internal Audit seeks to contribute to the improvement of public sector management by ensuring a strong, credible, effective and sustainable internal audit function within departments as well as government-wide. In response to this requirement, Aboriginal Affairs and Northern Development Canada (AANDC) has developed this three-year Risk-Based Audit Plan. This plan details the assurance services that Audit and Assurance Services Branch will provide, independent of line management, to sustain a strong, credible internal audit regime that contributes directly to sound risk management, control and governance.
Purpose
The Audit and Assurance Services Branch (AASB) of AANDC has prepared this document for the Deputy Minister to outline the Risk-Based Audit Plan 2013-2014 to 2015-2016 for Aboriginal Affairs and Northern Development Canada. The plan is designed to support the allocation of audit resources to those areas that represent the most significant priorities for AANDC and to respond to the requirements of the Treasury Board Policy on Internal Audit (April 1, 2012). In considering the appropriateness of the plan, the Deputy Minister is advised by an independent Audit Committee comprised of five external members.
Document Organization
Introduction | This section provides an overview of the role of the internal audit function and Treasury Board expectations with respect to audit to provide the reader with the context for this plan. |
---|---|
Risk-Based Audit Planning Approach | This section describes the process followed to build this plan. |
The Three-Year Risk-Based Audit Plan | This section details the comprehensive plan for 2013-2014 to 2015-2016, including a summary of activities over three years. |
Resource Considerations | This section details the resource considerations required to execute the audit plan. |
Appendices | This section provides various detailed tables to further describe the plan. |
The Role and Scope of Internal Audit
Internal audit plays a vital role in governance and accountability. Without a strong, objective and independent assurance function, the effectiveness of the overall governance framework of the organization is severely weakened. With an effective internal audit function, there is greater confidence that the decisions being taken are informed by appropriate information on risk and control. Internal audit's systematic and disciplined approach adds value and improves an organization's operations.
Through the Federal Accountability Act (2006) and Action Plan, the Government of Canada committed to strengthen auditing and accountability within departments by clarifying the managerial responsibilities of deputy heads within the framework of ministerial responsibility and by enhancing the internal audit function.
The role of the AANDC internal audit function is to ensure that, in conjunction with advice from the Audit Committee, AANDC's Deputy Minister is provided with independent assurance regarding the effectiveness of the Department's risk management, control and governance processes. The internal audit function fulfils this role by bringing a systematic, disciplined approach to assessing and improving the effectiveness of the Department's risk management, control and governance processes.
The scope of work of the internal audit function is to determine whether AANDC's network of risk management, control, and governance processes (as designed and represented by management) is adequate and functioning in a manner to ensure:
- Risks are appropriately identified and managed
- Financial, managerial, and operational information is accurate, reliable, and timely
- Compliance with policies, standards, procedures and applicable laws and regulations is achieved
- Resources are acquired economically, used effectively and adequately protected
- Programs, plans and objectives are achieved
- Quality and continuous improvement are fostered in the Department's control processes and
- Legislative or regulatory issues affecting the Department are recognized and addressed properly.
When opportunities for improving management control, governance, or resource stewardship are identified during audits, they are communicated to the suitable level of management so that appropriate action can be taken.
The internal audit function plays an important role in supporting departmental operations. It provides assurance on all the important aspects of the risk management strategy and practices, management control frameworks and practices and governance. Where control weaknesses exist and where the achievement of objectives is at risk, internal audit plays a role in providing constructive advice and recommendations. In this way, internal audit contributes to enhanced accountability and performance.
Treasury Board Policy Requirements
AANDC is subject to the Treasury Board Policy on Internal Audit. This policy states that the internal audit function in the Government of Canada "… is a professional, independent and objective appraisal function that uses a disciplined, evidence-based approach to assess and improve the effectiveness of risk management, control and governance processes."
The Policy on Internal Audit requires that the Deputy Minister approves a risk-based audit plan that considers departmental areas of high risk and significance and Government-wide audits led by the Comptroller General. The Treasury Board Directive on Internal Auditing in the Government of Canada (April 1, 2012) requires that the Chief Audit Executive " … establish and update at least annually a multi-year plan of internal audit engagements based on a risk assessment and which is focused predominantly on the provision of assurance services." The Directive also requires that the Audit Committee "… review and recommend for approval a multi-year risk-based internal audit plan."
The Treasury Board Internal Auditing Standards for the Government of Canada (October 1, 2012) specifies that "The Government of Canada has adopted the Institute of Internal Auditors' (IIA) International Professional Practices Framework and all federal departments are required to meet the IIA Standards in undertaking their internal auditing responsibilities, unless the Standards are in conflict with the Treasury Board Policy on Internal Audit or any related directives or standards in which case the Policy, directives or standards will prevail."
The Chief Audit Executive's Annual Written Report to the Deputy Minister and the Audit Committee
One of the requirements of the Directive on Internal Auditing in the Government of Canada is that the Chief Audit Executive prepares a written report annually to the Deputy Minister and the Audit Committee that includes sections on:
- "Internal audit's independence, proficiency, performance and results relative to its plan including resource utilization, lessons learned and influences on future years' plans
- The results of the Quality Assurance and Improvement Program including internal audit's conformance with the Internal Auditing Standards for the Government of Canada
- The results of the follow-up on the implementation of management action plans and
- An overview of the aggregate findings following the execution of the risk-based audit plan including the actions taken by management to address key findings."
Collectively, the Chief Audit and Evaluation Executive's annual report and other inputs, such as the Chief Financial Officer's Statement on Internal Control and reports of other assurance agencies, provide departmental Senior Management and the Comptroller General with assurance on the state of the Department's risk management, controls and governance processes.
Risk-Based Audit Planning Approach
To meet the requirement of the Directive on Internal Auditing in the Government of Canada for the establishment, and at least annual update, of a multi-year plan of internal audit, Audit and Assurance Services' assessment of AANDC's areas of risk was reviewed and updated to ensure that audit resources continue to be targeted to areas of highest risk.
In establishing priorities for the Risk-Based Audit Plan, AASB employs a structured, risk-based approach.
Conduct and Timing of an Internal Audit
Once approved, the Risk-Based Audit Plan provides AASB with the Deputy Minister's direction on what specific audits should be undertaken in the coming year. Each audit consists of the following phases:
The Planning Phase is undertaken to gain an understanding of the objectives, activities, key risks and controls of the area subject to audit. The audit objectives and scope are finalized and audit criteria are established. During the Conduct Phase, auditors carry out the audit program to ascertain whether each audit criterion is satisfied. Auditors conduct interviews, review documentation, perform analysis, observe activities and employ other techniques to obtain sufficient, relevant and reliable information to reach conclusions and support preliminary findings. Findings are reviewed with management to validate accuracy.
During the Reporting Phase, the draft audit report is prepared outlining background and context, and the auditor's findings, conclusions and recommendations. Management presenting a Management Response and Action Plan outlining their response to the findings as well as the corrective action planned to mitigate the identified control gaps.
In the Follow-up Phase, action is taken to ensure that the required measures have indeed been implemented.
The audit may last three (3) to twelve (12) months depending on the size and complexity of the area subject to audit as well as the specific scope and objectives of the engagement.
As a first step in updating the RBAP, AASB reviewed the audit universe to confirm that the existing auditable unitsFootnote 1 were still valid. The audit universe is a collection of all auditable units. The auditable units generally correspond to the activities and sub-activities identified in AANDC Program Alignment Architecture (PAA) and to the major organizational units of the Department (Appendix A presents the entire AANDC Audit Universe). AASB updated the universe to reflect minor changes to the PAA and current and planned resources allocations associated with the auditable units. In total, there are 48 program units, 33 internal service units, and 12 sectoral and 10 regional units.
AASB then reviewed departmental priorities, business conditions and risks as identified in a wide variety of sources, including corporate, sector and program risk profiles, corporate and sector business plans, Management Accountability Framework assessments, performance reports, past audit, evaluation and review reports, and last year's risk-based planning exercise. This year, we also reviewed the proposals for the implementation of the Deficit Reduction Action Plan (DRAP).
Following the update of the audit universe and the review of documentation, AASB held a planning and prioritization workshop with its team members and Risk Management, Evaluation and Performance Measurement and Review, Assessment and Investigation Services representatives. During this workshop participants examined each auditable unit and offered their perspective on each unit's level of inherent risk, significance and legal risk.
Inherent risk level is defined as the degree of risk to which the entity is exposed, considering current and anticipated business conditions and the presence and potential impact of specific risk exposures. Significance considers the relative importance of the program activity or internal service to the achievement of the Department's overall objectives. Significance includes materiality of the entity and its intrinsic importance. Legal risk considers the level of exposure to legal issues that may affect the activities of the Department.
Using the AANDC corporate risk assessment scales, where one is low risk and five is high risk, participants provided their assessment of risk for each auditable unit, with the exception of the internal audit, evaluation, risk management and complaints and allegations functions falling within the responsibilities of the Chief, Audit and Evaluation Executive position. While evidently the internal audit function could not audit itself objectively, there would be an appearance of lack of independence and objectivity should it attempt to assess the risks associated with and plan to audit other functions belonging to the same direct report.Footnote 2 Should it come to the attention of senior management that any of these functions may constitute a high risk to AANDC and should be subject to an audit, arrangements would be made for external firms to conduct the work under the direction of a senior ADM or the Audit Committee.
Auditable Units Priority Rankings
A weighting of 50% was allocated to Inherent Risk, 30% to Significance and 20% to Legal Risk to arrive at a risk score for each auditable unit assessed. A risk priority score was then assigned to each of the assessed auditable units in the universe and all units were assigned a priority score ranging from 0 to 1. As a final pass, all entities were further categorized as Very High, High, Moderate or Low risk based on the priority scores. The distribution of auditable units by rank is displayed in the chart to the right. The methodology employed is the same as was used in prior years to ensure that risk ratings and priorities are consistent on a year-to-year basis.
The products of this workshop became the basis for a consultation workshop with the members of the Directors General Implementation and Operations Committee (DGIOC) to review the risk ranking of auditable units and to comment upon an initial listing of potential projects over the three-year horizon of the plan. The information gathered during this session was useful in refining risk rankings and informing the scope and timing of planned audits.
Following revisions to the risk ranking and listing of potential projects resulting from the DGIOC session, AASB invited Assistant and Associate Deputy Ministers to provide their perspective on the recommended listing of potential projects and their scheduling. AASB also consulted with the Office of the Comptroller General, the Office of the Auditor General, and Health Canada to obtain their input on the identified risk levels and on the identification and timing of potential audits, particularly with respect to their planned audit activities. AASB also reviewed the identified risks and potential projects with members of the Audit committee.
Through discussions with Health Canada, AASB struck an agreement to work with their internal audit group over the coming year to identify AANDC and Health Canada Program Alignment Activities (PAA), which are related in some way. AANDC intends to look for opportunities to align their respective 2014-2015 audit projects to focus on higher risk areas of common interest.
Following consultations, AASB developed a final three-year audit plan taking into account the following planning considerations:
- The Risk-Based Audit Plan should be a body of work that can be reasonably achieved with AASB's current staff complement and operating budget
- Auditable units assessed as very high and high priority should be given priority and audited once in the three-year cycle, resources permitting
- Auditable units assessed as medium priority should only be considered for audit if all very high and high priority units are covered or if they represent an AANDC management priority
- Adequate coverage of corporate risks identified in the corporate risk profile should be obtained
- The three-year plan should ensure sufficient coverage of risk management, control and governance processes
- The timing of activities should take into account program evaluations, OAG, OCG and other central agency audits and any other considerations such as program renewals, so as not to place an unreasonable burden on any entity and to avoid duplication of effort and
- A reasonable allocation of effort should be included to conduct follow-up reviews and audit procedures to assess the adequacy of management actions in addressing past audit recommendations.
The Chief Audit and Evaluation Executive reviewed and approved the proposed Plan and presented it to Audit Committee members for their review and recommendation for approval by the Deputy Minister.
The implementation of the Plan will be monitored on a regular basis throughout the year and proposed changes will be reviewed and formally approved by the Audit Committee. An update of the plan will be presented at the mid-year meeting of the Audit Committee to confirm that it still covers the departmental priorities and highest risks.
The Three Year Risk-Based Audit Plan
This section presents an overview of the AANDC 2013-2014 to 2015-2016 Risk-Based Audit Plan.
Audit Coverage
The AANDC Risk-Based Audit Plan 2013-16 addresses areas of higher risk and significance.
This section descrisbes how the plan addresses areas of higher risk and significance. As detailed in Appendix A, there is complete coverage of all Very High and High ranked units.
The Corporate Risk Profile is management's point in time reflection of the most significant risks that threaten achievement of AANDC's mandate and AASB seeks to ensure that all of these risks are covered in the planned audits. The chart to the right summarizes the number of 2013-2014 audits that will address any one of the corporate risks. Every corporate risk is covered by at least two assurance engagements (audits). Appendix B presents the specific linkages of audits to risks.
Coverage of Corporate Risks (2013-2014)
In support of the CAEE's annual report to the Deputy Minister and the Audit Committee, the audit plan endeavours to address all elements of the Treasury Board's Management Accountability Framework (MAF). The chart to the right summarizes the extent to which the elements of this framework are covered in the planned audits for 2013-2014. Appendix C describes these linkages in greater detail.
As noted above, internal audit and evaluation are not subject to audit by internal audit as the auditor's independence and objectivity could be considered to be compromised.
Overage of MAF Areas of Management (2013-2014)
2013-2014 to 2015-2016 Audit Plan
Table 1 below outlines the number of planned program or corporate service audits, Management Practices Audits, and OCG audits for each of the three years of the plan.
Ongoing | 2013-2014 | 2014-2015 | 2015-2016 | |
---|---|---|---|---|
Audits | 2 | 13 | 13 | 10 |
Management Practices Audits | 0 | 3 | 3 | 3 |
OCG Audits | 0 | 1 | 1** | 1** |
Total | 2 | 17 | 17 | 14 |
** To be determined
Table 2 below presents the planned audits for 2013-2014 and identifies the audit priority assigned to them and the fiscal quarters in which they are expected to begin and in which the results are expected to be presented to the Audit Committee (AC in the table).
Table 3 lists the proposed audits for 2014-2015 and 2015-2016 and their audit priority ranking. The audit plans for 2014-2015 and 2015-2016 are tentative and the selection and timing of audits will be revisited during next year's annual planning exercise.
2012-2013 (ongoing) |
2013-2014 (Year 1) |
||||||
---|---|---|---|---|---|---|---|
Priority | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | |
Ongoing (projects commenced in 2012-13 to be completed in 2013-14) | |||||||
1. Audit of the Management Control Framework for Grants and Contributions 2012-2013 (Funding Approaches) |
Very High | AC | |||||
2. Audit of Emergency Management Assistance | Very High | AC | |||||
2013-2014 Projects | |||||||
1. Follow-up Audit of Capacity Development | Very High | AC | |||||
2. Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements | Very High | AC | |||||
3. Audit of the Implementation of Modern Treaty Obligations | Very High | AC | |||||
4. Audit of Indian Registration System | Very High | AC | |||||
5. Audit of Economic Development Programs | Very High | AC | |||||
6. Audit of Grants and Contribution Management Control Framework 2013-2014 | Very High | * | |||||
7. Audit of IM/IT Governance and Application Systems Integration | Very High | AC | |||||
8. Audit of Southern Oil and Gas | Very High | AC | |||||
9. Management Practices Audit of Policy and Strategic Direction | Very High | AC | |||||
10. Management Practices Audit of Treaty and Aboriginal Government | Very High | AC | |||||
11. Audit of Nutrition North | High | AC | |||||
12. Audit of Project Management of the Canadian High Arctic Research Station | High | AC | |||||
13. System Under Development Audit of the Integrated Financial Management System ( SAP & GCIMS) | High | * | |||||
14. Audit of Corporate Business Planning | High | AC | |||||
15. Audit of Delegation of Authorities, Organization Design and Classification | High | * | |||||
16. Management Practices Audit – Human Resources and Workplace Services | High | AC | |||||
17. OCG Horizontal Internal Audit - TBD | High | * | |||||
Note* These audits will be completed and presented to the Audit Committee in Q1 2014-2015. |
Priority | |
---|---|
2014-2015 Projects | |
1. Follow-up Audit of the Education Information System | Very High |
2. Audit of Northern Contaminated Sites | Very High |
3. Audit of the Management Control Framework for Grants and Contributions 2014-15 | Very High |
4. Audit of Elementary and Secondary Education | Very High |
5. Management Practices Audit (three to be determined) | Very High/High |
6. Audit of Post Secondary Education | High |
7. Audit of Assisted Living and National Child Benefit Reinvestment | High |
8. Follow-up Audit of the Independent Assessment Process | High |
9. Audit of On-reserve Infrastructure (excluding Water and Wastewater) | High |
10. Audit of Northern Oil and Gas | High |
11. Audit of Litigation Management | High |
12. Audit of IM/IT Security | High |
13. Audit of Occupational Health and Safety | High |
14. Post Implementation Audit of DRAP | High |
2015-2016 Projects | |
1. Follow-up Audit of Income Assistance | Very High |
2. Follow-up Audit of First Nations Child and Family Services | Very High |
3. Follow-up Audit of Water and Wastewater | Very High |
4. Audit of the Management Control Framework for Grants and Contributions 2015-16 | Very High |
5. Audit of Information Management | Very High |
6. Management Practices Audit (three to be determined) | Very High/High |
7. Audit of Specific Claims | High |
8. Follow-up Audit of Lands Management (including Lands Registry System) | High |
9. Audit of Additions to Reserve | High |
10. Audit of Values and Ethics | High |
11. Audit of Internal Controls over Financial Reporting | High |
The detailed audit plan for 2013-2014, including project objectives, scope and rationale, is presented in Appendix D. Consistent with the requirements of the Internal Auditing Standards of the Government of Canada, all audits will be designed to achieve a high level of assurance.
Changes to the Plan
As noted previously, the multi-year audit plan is updated annually with adjustments during the year, if necessary. This year's audit plan is an evolution of the 2012-2013 to 2014-2015 Plan and, as such, includes two on-going audits that will be completed in 2013-2014 and other projects that have been cancelled or deferred as a result of changing business priorities and conditions. Details of these changes can be found in Appendix E.
Challenges to Achieving Fulfillment of the Three-Year Plan
AANDC programs and services are delivered in a complex policy and political environment that is constantly evolving and shifting from a legalistic approach to a policy-based approach that is more focused on reconciliation, partnerships, and the sustainable development of Aboriginal communities. Two risk factors that were identified in the 2012-2013 Corporate Risk Profile are of particular importance to the successful implementation of the Risk-Based Audit Plan. These are: (1) the risk related to the availability of timely, pertinent, consistent, and accurate information and (2) the risk related to the need to attract, recruit and retain sufficiently qualified, experienced and representative employees. Given this context, the plan allows flexibility to respond to emerging risks and policy or program changes. If these risks or changes emerge and suggest higher priority audit activity, the Plan will be adjusted so that internal audit can undertake appropriate responses.
To support the need for flexibility, AASB has adopted an approach whereby internal resources are supplemented with qualified contractors. Considering the cross-government shortage of qualified auditors, this approach not only allows AASB to access required capacity and skills but also facilitates transfer of knowledge and skills to internal resources, thereby building internal capacity. While contracting continues to represent challenges for a variety of reasons, AASB was successful in 2012-2013 in establishing competitive supply arrangements under the Professional Audit Support Services Supply Arrangement (PASS) should offer more efficient contracting.
AANDC's implementation of the Government of Canada's Deficit Reduction Action Plan (DRAP) will likely continue to impair AASB's ability to obtain timely access to departmental managers and staff over the planning period. It is also possible that AASB will be called upon to focus more attention on implementation of DRAP measures.
In its effort to adjust to the challenges raised by the implementation of Budget 2012 and the Deficit Reduction Action Plan, AASB has taken a series of actions including the following:
- Senior management and DAC members have been kept informed on a more frequent basis on the changes to the plan
- Reassessment of the alignment between AASB resources and the plan has been conducted to ensure the capacity exists to support the implementation of the RBAP and
- Consulting engagements have been employed to support the HR function in the implementation of DRAP.
Resource Considerations
This section presents the resource requirements of all internal audit activities planned for 2013-2014. Projects actually undertaken will depend on the availability of financial and human resources. The estimated resource requirements for small, medium, and large projects have been updated to reflect current forecasts and are consistent with the results of historical project cost analysis for the last three fiscal years (2010-2011 to 2012-2013). This approach has proven to be the most accurate basis for forecasting costs, as specific requirements can only be determined once audit planning has been completed.
The Audit and Assurance Services Branch assurance activities represent 92% (91% for AANDC-led and 1% for OCG-led) of branch resource requirements. Other internal audit activities, including monitoring of action plans from past audits, annual audit planning, quality assurance and improvement, reporting, learning and development, and liaison with OAG and other external assurance providers, represents 8%.
The Three-Year Plan identifies an average of 17 audit projects to be carried out on an annual basis.
Resource Requirements
While the level of effort and cost will vary from project to project, it is our professional opinion that this level of resourcing is adequate to achieve the plan.
Appendix A - AANDC Audit Universe
Departmental Program Auditable Units (12) | Planned Audit(s)* |
---|---|
Northern Contaminated Sites | Audit of Northern Contaminated Sites (2014-2015) |
First Nations Child and Family Services | Follow-up Audit of First Nations Child and Family Services (2015-2016) |
Registration and Membership | Audit of the Indian Registration System (2013-2014) |
Elementary and Secondary Education | Follow-up Audit of the Education Information System (2014-2015) Audit of Elementary and Secondary Education (2014-2015) |
Income Assistance | Follow-up Audit of Income Assistance (2015-2016) |
Environmental Management | Audit of Emergency Management Assistance (began in 2012-2013) |
Implementation of Modern Treaty Obligations | Audit of the Implementation of Modern Treaty Obligations (2013-2014) |
Water and Wastewater Infrastructure | Follow-up Audit of Water and Wastewater Infrastructure (2015-2016) |
Housing | Audit of On-Reserve Infrastructure (2014-2015) |
Negotiations of Claims and Self-Government | Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements (2013-2014) |
Activation of Community Assets | Audit of Economic Development Programs (2013-2014) Audit of Southern Oil and Gas (2013-2014) Follow-up Audit of Lands Management (incl. Lands Registry System) (2015-2016) |
Institutions and Organizations | Follow-up Audit of Capacity Development (2013-2014) |
Internal Services Auditable Units (2) | Planned Audit(s) * |
---|---|
Grants and Contributions Controls | Audit of the Management Control Framework for Grants and Contributions (begun in 2012-2013), (2013-2014), (2014-2015), (2015-2016) Post Implementation Audit of DRAP (2014-2015) |
Information Management | Audit of IM/IT Governance and Application Systems Integration (2013-2014) System Under Development Audit of the IFMS (SAP and GCIMS) (2013-2014) Follow-up Audit of the Education Information System (2014-2015) Audit of the Indian Registration System (2013-2014) Audit of Information Management (2015-2016) Follow-up Audit of Lands Management (incl. Lands Registry System) (2015-2016) |
* Very High Risk Auditable Units will be subject to audit coverage (in whole or in part) at least once every three years
Departmental Program Auditable Units (15) | Planned Audit(s)* |
---|---|
Specific Claims | Audit of Specific Claims (2015-2016) |
Community Infrastructure Assets and Facilities | Audit of On-Reserve Infrastructure (2014-2015) |
Post-Secondary Education | Audit of Post-Secondary Education Programs (2014-2015) |
Aboriginal Entrepreneurship | Audit of Economic Development Programs (2013-2014) |
Registration of Rights and Interests in Reserve Lands | Follow-up Audit of Lands Management (incl. Lands Registry System) (2015-2016) |
Independent Assessment Process | Follow-up Audit of the Independent Assessment Process (2014-2015) |
Education Facilities | Audit of On-Reserve Infrastructure (2014-2015) |
Nutrition North | Audit of Nutrition North Canada (2013-2014) |
Management of Moneys | Audit of Southern Oil and Gas (2013-2014) |
Assisted Living | Audit of Assisted Living and National Child Benefit Reinvestment (2013-2014) |
Science Initiatives | Audit of Project Management of the Canadian High Arctic Research Station (2013-2014) |
First Nations Governments | Follow-up Audit of Capacity Development (2013-2014) |
Additions to Reserve | Audit of Additions to Reserve (2015-2016) |
Northern Oil and Gas | Audit of Northern Oil and Gas (2014-2015) |
National Child Benefit Reinvestment | Audit of Assisted Living and National Child Benefit Reinvestment (2013-2014) |
Information Technology | Audit of the Indian Registration System (2013-2014) Audit of IM/IT Governance and Application Systems Integration (2013-2014) System Under Development Audit of the Integrated Financial Management System (SAP and GCIMS) (2013-2014) Follow-up Audit of the Education Information System (2014-2015) Follow-up Audit of Lands Management (incl. Lands Registry System) (2015-2016) Audit of Internal Controls Over Financial Reporting (2015-2016) |
Expenditure Management | Post Implementation Audit of DRAP (2014-2015) Audit of Internal Controls Over Financial Reporting (2015-2016) |
Litigation Management | Audit of Litigation Management (2014-2015) |
IM/IT Security | Audit of IM/IT Security (2014-2015) |
Organizational Design and Classification | Audit of Delegation of Authorities, Organizational Design and Classification (2013-2014) Management Practices Audit of Human Resources and Workplace Services (2013-2014) Post Implementation Audit of DRAP (2014-2015) |
Corporate Business Planning | Audit of Corporate Business Planning (2013-2014) Audit of Internal Controls Over Financial Reporting (2015-2016) |
IM/IT Governance | Audit of IM/IT Governance and Application Systems Integration (2013-2014) System Under Development Audit of the Integrated Financial Management System (SAP and GCIMS) (2013-2014) Audit of the Indian Registration System (2013-2014) |
Values and Ethics | Audit of Values and Ethics (2015-2016) |
Occupational Health and Safety | Audit of Occupational Health and Safety (2014-2015) |
* High Risk Auditable Units will be subject to audit coverage (in whole or in part) at least once every three years.
Departmental Program Auditable Units (14) | Internal Services Auditable Units (15) |
---|---|
Political Development and Inter-Government Relations | External Reporting |
Family Violence Prevention | Communications |
Estate Management | Assets and Property Management |
Management of Treaty Relationships | Performance Measurement and Reporting |
Métis and Non-Status Indian Relations and Métis Rights Management | Compensation and Benefits |
Strategic Federal Investments and Partnerships | ATIP Management |
Consultation and Engagement | HR Staffing and Planning |
Urban Aboriginal Participation | Financial Planning and Budgeting |
Northern Mines and Minerals | Loans and Accounts Receivable |
Northern Land and Water Management | Corporate Security |
Northern Environmental Management | Learning and Development |
Clarity of Reserve Boundaries | Continuity of Operations |
Commemoration | Strategic Policy Development |
Common Experience Payment | Labour Relations |
Revenues |
Departmental Program Auditable Units (7) | Internal Services Auditable Units (3) |
---|---|
Northern Contaminants | Official Languages |
Inuit Relations | Accommodations |
Management of Other Negotiated Settlements | Library and Information Centre |
Renewable Energy and Energy Efficiency | |
Treaty Annuities | |
Support to the Truth and Reconciliation Commission | |
Climate Change Adaptation |
Departmental Program Auditable Units (0) | Internal Services Auditable Units (4) |
---|---|
Audit and Evaluation | |
Risk Management | |
Complaints and Allegations | |
Legal Services |
Sectors and Regions
Ranking | Sectors |
---|---|
Chief Financial Officer | Very High |
Education and Social Development Programs and Partnerships | Very High |
Regional Operations | Very High |
Treaties and Aboriginal Government | Very High |
Resolution & Individual Affairs | Very High |
Policy and Strategic Direction | Very High |
Human Resources and Workplace Services | High |
Lands and Economic Development | High |
Northern Affairs | High |
Indian Residential Schools Adjudication Secretariat | High |
Corporate Secretariat | Moderate |
Communications | Moderate |
Ranking | Regions |
---|---|
Ontario | Very High |
Manitoba | Very High |
Atlantic | Very High |
Saskatchewan | High |
Alberta | High |
Nunavut | High |
Northwest Territories | Moderate |
Quebec | Moderate |
British Columbia | Moderate |
Yukon | Moderate |
Appendix B - Linkage of 2013-2014 Audits to the Corporate Risk Categories
2013-2014 Audit Projects | HR Capacity and Capability | Information for Decision Making | Transformation & Implementation |
Resource Alignment | Government Partnership | Aboriginal Relationship | External Partnership | Legal | Environmental |
---|---|---|---|---|---|---|---|---|---|
Ongoing | |||||||||
Audit of the Management Control Framework for Grants and Contributions 2012-2013 (Funding Approaches) | Selected | Selected | Selected | Selected | |||||
Audit of Emergency Management Assistance | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |
2013-2014 Projects | |||||||||
Follow-up Audit of Capacity Development | Selected | Selected | Selected | Selected | Selected | Selected | |||
Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements | Selected | Selected | Selected | Selected | Selected | Selected | |||
Audit of the Implementation of Modern Treaty Obligations | Selected | Selected | Selected | Selected | Selected | Selected | Selected | ||
Audit of the Indian Registration System | Selected | Selected | Selected | Selected | |||||
Audit of Economic Development Programs | Selected | Selected | Selected | Selected | Selected | Selected | |||
Audit of the Management Control Framework for Grants and Contributions 2013-2014 | Selected | Selected | Selected | Selected | Selected | ||||
Audit of IM/IT Governance and Systems Integration | Selected | Selected | Selected | Selected | Selected | ||||
Audit of Southern Oil and Gas | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |
Management Practices Audit of Policy and Strategic Direction | Selected | Selected | Selected | Selected | |||||
Management Practices Audit of Treaties and Aboriginal Government | Selected | Selected | Selected | Selected | |||||
Audit of Nutrition North | Selected | Selected | Selected | Selected | Selected | ||||
Audit of Project Management of the Canadian High Arctic Research Station | Selected | Selected | Selected | Selected | |||||
System Under Development Audit of the Integrated Financial Management System ( SAP & GCIMS) | Selected | Selected | Selected | ||||||
Audit of Corporate Planning | Selected | Selected | Selected | Selected | |||||
Audit of Delegation of Authorities, Organization Design and Classification | Selected | Selected | Selected | Selected | |||||
Management Practices Audit of Human Resources and Workplace Services | Selected | Selected | Selected | Selected | |||||
OCG Horizontal Internal Audit – TBD |
Appendix C - Linkage of 2013-2014 Audits to MAF Elements
2013-2014 Audit Projects |
Value and Ethics |
Managing for Results |
Governance and Planning |
Citizen-focused Service |
Internal Audit (1) |
Evaluation (1) | Financial Management and Control |
Management of Security |
Integrated Risk Management |
People Management |
Procurement | Information Management |
Information Technology |
Asset Management |
Investment Planning and Management of Projects |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Ongoing | |||||||||||||||
Audit of the Management Control Framework for Grants and Contributions 2012-2013 (Funding Approaches) | Selected | Selected | Selected | Selected | |||||||||||
Audit of Emergency Management Assistance | Selected | Selected | Selected | Selected | |||||||||||
2013-2014 Projects | |||||||||||||||
Follow-up Audit of Capacity Development | Selected | Selected | Selected | Selected | |||||||||||
Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements | Selected | Selected | Selected | Selected | |||||||||||
Audit of the Implementation of Modern Treaty Obligations | Selected | Selected | Selected | Selected | Selected | ||||||||||
Audit of Indian Registration System | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | ||||||
Audit of Economic Development Programs | Selected | Selected | Selected | Selected | Selected | ||||||||||
Audit of the Management Control Framework for Grants and Contributions 2013-2014 | Selected | Selected | Selected | Selected | Selected | ||||||||||
Audit of IM/IT Governance and Application System Integration | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |||||||
Audit of Southern Oil and Gas | Selected | Selected | Selected | Selected | Selected | Selected | |||||||||
Management Practices Audit of Policies and Strategic Direction | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |||||||
Management Practices Audit of Treaties and Aboriginal Government | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |||||||
Audit of Nutrition North | Selected | Selected | Selected | Selected | |||||||||||
Audit of Project Management of the Canadian High Arctic Research Station | Selected | Selected | Selected | Selected | Selected | Selected | Selected | ||||||||
System Under Development Audit of the Integrated Financial Management System ( SAP & GCIMS) | Selected | Selected | Selected | Selected | Selected | Selected | Selected | ||||||||
Audit of Corporate Planning | Selected | Selected | Selected | Selected | Selected | ||||||||||
Audit of Delegation of Authorities, Organization Design and Classification | Selected | Selected | Selected | Selected | Selected | Selected | Selected | ||||||||
Management Practices Audit of Human Resources and Workplace Services | Selected | Selected | Selected | Selected | Selected | Selected | Selected | Selected | |||||||
OCG Horizontal Internal Audit – TBD | |||||||||||||||
Note (1) - These 2 Areas of MAF are the responsibility of the CAEE; therefore, they were not considered. |
Appendix D - 2013-2014 Audit Projects
The detailed audit plan for 2013-2014 is presented below with each project described in terms of its objective, scope and rationale.
Audit Objective and Scope | Rationale for Conduct |
---|---|
Follow-up Audit of Capacity Development | Very High |
The objectives of the audit are to assess: the adequacy and effectiveness of departmental controls for designing, approving, integrating and reporting on capacity development programs; and the appropriateness of the design of region and sector controls for delivering capacity development programming in an integrated, efficient and effective manner. The scope of the audit covers the period April 1, 2009 to March 31st, 2013 and included assessments of:
|
Maps to Program Alignment Architecture
There is a risk that the Department's mandate of supporting Aboriginal people and Northerners in their efforts to: improve social and economic prosperity; develop healthier, more sustainable communities; and, participate more fully in Canada`s political, social and economic development, will not be realized if capacity development programming is not improved. |
Audit of Negotiation of Comprehensive Land Claims and Self Government Agreements | Very High |
The preliminary objective of this audit is to assess the adequacy and effectiveness of controls in place to support the negotiation of comprehensive land claims and self-government agreements. The preliminary scope will include an assessment of the adequacy of the design of the management control framework to ensure effective, efficient and timely negotiations in a results based environment. The timing of the audit will be coordinated with the Audit of the Implementation of Modern Treaty Obligations to maximize the benefits and minimize disruption to the auditee. |
Maps to Program Alignment Architecture
|
Audit of the Implementation of Modern Treaty Obligations | Very High |
The objective of this audit is to provide assurance to management of the adequacy and effectiveness of controls in place to support AANDC's role in the coordination and oversight of the implementation of federal obligations included within existing comprehensive land claim agreements and self-government agreements. The scope of this audit includes obligations scheduled for implementation during the period from April 1, 2011 to March 31, 2013. This includes all agreements/ obligations which have an effective date subsequent to April 2011. An appropriate coverage of agreements and obligations will be determined through the development of a sampling approach. Due to the inherent risks associated with non-compliance with the obligations outlined in the agreements and the role that AANDC plays in the coordination and oversight of these federal obligations, this audit focuses on the following AANDC activities: (A) Oversight and Coordination
|
Maps to Program Alignment Architecture
|
Audit of the Indian Registration System | Very High |
The objective of this audit is to provide assurance to management on the adequacy and effectiveness of process and IT application controls in place to ensure the integrity of information contained in the Indian Registration System. The scope of the audit covers the period November 2011 to November 2013 and will include assessments of the design and operational effectiveness of manual and automated controls used to ensure that: (i) Qalipu applications are accurately processed and recorded in Phase I (design and operational effectiveness) and are appropriately assessed in Phase II (design only); (ii) Information entered into the system through various sources, including IRAs and IROs, is reliable and access to it is protected; and, (iii) Remediation has taken place or there is a plan in place to remediate issues surrounding: IRS general system controls, core application controls, system stabilization, registration process controls, IRS governance, and project management. The scope of the audit alsos include an assessment of key documentation produced for the SIRCU initiative (Phase I) and for gates I and II of Phase II (Indian Registration and Estates Management System) of the IRS modernization initiative in order to identify potential weaknesses and gaps that can be address prior to the implementation of these phases. Key documentation produced for gates III to VII of Phase II will not be included in the scope of the audit, nor will key documentation for the SIRCU initiative produced after November 1, 2013. |
Maps to Program Alignment Architecture
|
Audit of Economic Development Programs | Very High |
The preliminary objective of the audit is to determine if the management control framework for funding provided to recipients under Economic Development Programs ensures that benefits or results are consistent with program goals and terms and conditions, that appropriate performance and reporting requirements are established, and
that activities are monitored to ensure compliance with program terms and conditions and funding agreements. The preliminary scope of the audit includes an examination of the adequacy of controls through testing of key controls in a sample of funding awarded. |
Maps to Program Alignment Architecture
|
Audit of the Management Control Framework for Grants and Contributions 2013-2014 | Very High |
The objective of the audit is to assess the adequacy and effectiveness of the management control framework for grant and contribution programs. As the framework and the Department's programs and their risks evolve, the specific objectives and scope for audit activity in a given year are based upon a current risk assessment conducted during the planning phase. In assessing the adequacy and effectiveness of selected controls, the audit includes an examination of their application horizontally, i.e. through a sample of programs and regions. |
Maps to Program Alignment Architecture
|
Audit of IM/IT Governance and Application Systems Integration | Very High |
The objective of this audit is to assess the adequacy and effectiveness of IM/IT governance structures, processes and controls in place to support the effective management of IM/IT resources, including integration among AANDC's key IM/IT application systems. The scope of the audit will cover the period April 1, 2011 to June 30, 2013 and will include:
Audit fieldwork will be conducted in headquarters and in the regional offices of British Columbia and Ontario, selected for their high and moderate levels of IM/IT spending, respectively. |
Maps to Program Alignment Architecture
|
Audit of Southern Oil and Gas | Very High |
The objective of the audit is to determine whether AANDC and Indian Oil and Gas Canada are fulfilling their obligations with respect to management of oil and gas resources on reserve in an efficient, effective and controlled manner. The audit scope includes an assessment of the adequacy and effectiveness of the governance, risk management, and internal controls in place to support the effective and efficient execution of AANDC's and the IOGC's responsibilities in managing oil and gas resources on First Nation reserves. The audit scope includes processes and controls in place used by IOGC to
The scope of the audit covers all IOGC activities during the period April 1, 2011 through to March 31, 2013. |
Maps to Program Alignment Architecture
|
Management Practices Audit of Policy and Strategic Direction | Very High |
The objective of the audit is to provide senior management with assurance over the adequacy and effectiveness of a selection of high risk management controls and activities in place to support the achievement of the Sector's objectives. The scope of the audit covers a range of high risk management practices as identified through a CSA workshop, preliminary interviews, a review of previous audit and review findings, and a review of departmental priorities. Audit fieldwork is being conducted at AANDC Headquarters. Testing covers the fiscal years 2011-12 – 2012-13. |
Maps to Program Alignment Architecture
|
Management Practices Audit of Treaties and Aboriginal Government | Very High |
The objective of the audit is to provide senior management with assurance over the adequacy and effectiveness of a selection of high risk management controls and activities in place to support the achievement of the Branch's objectives. The scope of the audit covers the following five management practices areas, as identified through a CSA workshop, preliminary interviews, a review of previous audit and review findings, and a review of departmental priorities.
|
Maps to Program Alignment Architecture
|
Audit of Nutrition North Canada | High |
The objective of the audit is to assess the extent to which the Nutrition North Canada (NNC) Program has been implemented as intended, and that adequate and effective governance, risk management, and management controls are in place to support effective and efficient administration and program delivery. The audit scope includes an assessment of the following:
|
Maps to Program Alignment Architecture
|
Audit of Project Management of the Canadian High Arctic Research Station | High |
The objective of the audit is to provide assurance to management that an appropriate project management framework between AANDC, PWGSC and Public-Private Partnerships (PPP) Canada is in place to ensure that the CHARS facility is delivered on time and within budget, and that the CHARS facility is aligned to meet the strategic objectives of the Science and Technology program planned for the facility. The scope of the audit includes an examination of the governance and project management practices related to the definition, design, build and planned operation of the research station such that it supports the Science and Technology program planned for the facility. The scope period of the audit spans from the announcement of the project in November 2007 (Definition Phase) to 31 July 2013 (currently in Design Phase), understanding that the project is still ongoing and components of the project management approach are still under development. There is a requirement for regional site visits to the regional PWGSC offices in both Edmonton and Winnipeg, where resources responsible for project management, contracting, and procurement are located. The audit does not seek to examine the processes by which the location of the CHARS facility was selected nor will it seek to evaluate the effectiveness of the Science and Technology program. |
Maps to Program Alignment Architecture
|
System under Development Audit of the Integrated Financial Management System (SAP and GCIMS) | High |
The preliminary objective of the audit is to assess the adequacy and likely effectiveness of the project management framework in place to ensure that expected results are delivered within budget and on time with no loss of data integrity or functionality. The scope of the audit includes an examination of governance and project management practices. |
Maps to Program Alignment Architecture
|
Audit of Corporate Business Planning | High |
The objective of this audit is to assess the adequacy and effectiveness of those management controls that support corporate business planning and compliance with relevant Treasury Board and departmental requirements. Specifically, the objective is to assess the extent to which corporate business planning processes:
|
Maps to Program Alignment Architecture
|
Audit of the Delegation of Authorities, Organization Design and Classification | High |
The objective of this audit is to provide assurance that AANDC management controls in place for organizational design, classification, and associated delegation of authorities are adequate and effective in supporting efficient delivery of programs and services. The audit scope includes an assessment of:
A sample of organization design changes and classifications actions will be reviewed based on risk and audit coverage. For sampling purposes, the review and the testing will cover the period from April 1, 2012 to August 31, 2013. Sample selection will performed in a manner which complements monitoring file review performed by the Quality Assurance Unit (QAU) (i.e. coverage, type of action, risk level). A sample of QAU monitoring review files will be selected to provide assurance on QAU monitoring practices. Audit fieldwork will include site visits to the three Regional HR Service Centers. The audit scope will not include an audit of the IT systems supporting delegation of authority, organizational design, and classification roles and responsibilities. |
Maps to Program Alignment Architecture
|
Management Practices Audit of Human Resources and Workplace Services | High |
The objective of the audit is to provide senior management with assurance over the adequacy and effectiveness of a selection of high risk management controls and activities in place to support the achievement of the Branch's objectives. The scope of the audit covers the following five management practices areas, as identified through a CSA workshop, preliminary interviews, a review of previous audit and review findings, and a review of departmental priorities.
|
Maps to Program Alignment Architecture
|
OCG Horizontal Internal Audit - TBD | High |
Objective and scope TBD. | Maps to Program Alignment Architecture:
|
Appendix E - Changes to the Audit Plan
Ongoing Audits
The resource implications of audit projects that began in 2012-2013, but were not completed within that period are identified below.
2012-2013 Ongoing Audits | Expected Completion Date |
---|---|
Audit of Grants and Contributions Management Control Framework | Q1 2013-2014 |
Audit of Emergency Management Assistance | Q1 2013-2014 |
Removed, Deferred or Added Audits
The table below identifies all the changes to the 2012-2013 to 2014-2015 Plan, and the 2013-2014 to 2015-2016 Plan approved by the Deputy Minister on February 27, 2013.
Audit Name and Year Planned | Rationale |
---|---|
Audit of Elementary and Secondary Schools (2013-2014) | This audit has been deferred to 2014-2015 (and renamed as the Audit of Elementary and Secondary Education) because the later timing will provide more value to the program as it will be in the process of implementing new legislation that is expected to be passed during 2013-14. This legislation is expected to bring major changes to the program. |
Audit of the Management of Moneys (2013-2014) | This audit has been removed from the plan. The Management of Moneys auditable unit, which was identified as a high risk, will be covered through the Audit of Southern Oil and Gas (2013-14). |
Audit of Claims, Litigation and Environmental Liabilities (2013-14) | This audit has been removed from the audit plan and replaced with an Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements (2013-14) and an Audit of Litigation Management (2014-15). The environmental liabilities component of the audit was removed as it was covered in the Fall 2012 report of the Commissioner of the Environment and Sustainable Development – Financial Assurances for Environmental Risks. |
Post – Implementation Audit of the Education Information System (2013-2014) | This audit has been deferred to 2014-2015 (and renamed as the Follow-up Audit of the Education Information System). |
Management Practices Audit of the Resolution & Individual Affairs (2013-2014) | This audit has been removed from the plan as it was not identified in the revised risk assessment of MPA sectors and regions that was undertaken in 2013-2014 to determine the specific organizations to be audited in year one of the plan. |
Management Practices Audit of the Ontario Region (2013-2014) | This audit has been removed from the plan as it was not identified in the revised risk assessment of MPA sectors and regions that was undertaken in 2013-2014 to determine the specific organizations to be audited in year one of the plan. |
Management Practices Audit of the Manitoba Region (2013-2014) | This audit has been removed from the plan as it was not identified in the revised risk assessment of MPA sectors and regions that was undertaken in 2013-2014 to determine the specific organizations to be audited in year one of the plan. |
Audit of Southern and Northern Oil and Gas (2014-2015) | The audit has been removed from the plan (and replaced with an Audit of Southern Oil and Gas (2013-2014) and an Audit of Northern Oil 2014-2015)) |
Management Practices Audit of the Lands and Economic Development (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Management Practices Audit of the Northern Affairs (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Management Practices Audit of the Indian Resolution Schools Adjudication Secretariat (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Management Practices Audit of the Atlantic Region (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Management Practices Audit of the Alberta Region (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Management Practices Audit of the Nunavut Region (2014-2015) | A revised risk assessment of MPA sectors and regions will be undertaken in 2014-2015 to determine the specific organizations to be audited in years two and three of the Plan. |
Additions
Audit Name and Year Planned | Rationale |
---|---|
Audit of Capacity Development (2013-2014) | The audit was renamed as the Follow-up Audit of Capacity Development. |
Audit of Delegation of Authorities, Organization Design and Classification (2013-2014) | The audit was identified as a high risk during the 2013-2014 RBAP risk assessment. |
Audit of IM/IT Governance and Application Systems Integration (2013-2014) | The audit was included in the plan to address risks associated with the Department's IM/IT governance and systems integration practices identified in previous audits. |
Audit of Nutrition North (2013-2014) | The audit was renamed as the Audit of Nutrition North Canada. |
Audit of Project Management of the Canadian High Arctic Research Station (2013-2014) | The audit was identified as a high risk during the 2013-2014 RBAP risk assessment. |
System Under Development Audit of the Integrated Financial Management System (SAP & GCIMS) (2013-2014) | The audit was identified as a high risk during the 2013-2014 RBAP risk assessment. |
Audit of Negotiation of Comprehensive Land Claims and Self-Government Agreements (2014-2015) | The audit was advanced to 2013-2014 as a partial replacement for the Audit of Claims, Litigation and Environmental Liabilities (2013-14) that was removed from the plan. |
Audit of IT Security (2014-2015) | The audit was renamed the Audit of IM/IT Security to ensure that IM and IT security risks were both assessed. |
Audit of Southern and Northern Oil and Gas (2014-2015) | The audit has been removed from the plan (and replaced with an Audit of Southern Oil and Gas (2013-2014) and an Audit of Northern Oil 2014-2015. |
Audit of Strategic and Business Planning (2014-2015) | The audit was advanced to 2013-2014 (and renamed the Audit of Corporate Business Planning) to address risks associated with the Department's planning processes identified in previous audits. |
Audit of the Indian Registration System (2014-2015) | The audit was advanced to 2013-2014 to address the risks associated with increased processing of Indian registration applications and the development and implementation of a new Indian Registration Systems. |